Boulder Buster - ChemBreak Comparison



Boulder Buster

  • Capital cost of the Boulder Buster.
  • Much less drilling, 1 to 2 holes per large boulder.
  • Lower cost of material per hole.
  • Rock breaks instantly on firing.

Conclusion:   Suitable for contractors with on going rock breaking requirements.   The reduced drilling and material costs will rapidly repay the capital investment in the Boulder Buster.   The instant result will not delay on going work on the site. 

ChemBreak

  • No up front capital cost.
  • More drilling, holes to be 10” to 12” apart.
  • Higher cost of material per rock broken.
  • 24 to 48 hour waiting period.

Conclusion:   Suitable for smaller one off jobs and concrete demolition.   The increased drilling and material costs will be less than the capital cost of the Boulder Buster.